How residential approvals work in NSW – the three development pathways, what a DA and a CDC each involve, what BASIX covers, and the documents an application needs.
FAQs
Approvals, applications and documentation.
What are the three approval pathways for residential development in NSW?
Exempt Development needs no approval, has minimal impact on the environment and amenity, and must comply with the pre-set standards in Part 2 Exempt Development Codes of the Codes SEPP. Complying Development is certified by a certifier against the pre-set standards and conditions in the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, for development with predictable environmental and amenity impacts. Development Consent is issued by the local council for development with possible major environmental or amenity impact, through a merit assessment under the Environmental Planning and Assessment Act 1979, guided by Local Environmental Plans and local Development Control Plans.
What is a Development Application?
A Development Application is an official request for permission to start a development. Development can mean the construction or demolition of a building, the use of land, or the subdivision of land. The council assesses the application against the Local Environmental Plan and Development Control Plan controls and all other relevant planning regulations and laws, and each application is decided on its own merit, including whether the proposal suits the site and the neighbourhood.
Why is a DA required?
Development consent is required for new buildings and major renovations that affect the environment or may affect the amenity of surrounding residents. It exists to ensure developments do not have a negative impact on the environment, to balance public and private interest in the desired and future character of the area, to provide a non-biased process that lets the community raise issues, to ensure local services and infrastructure are adequate, and to ensure structural safety with enough ventilation and sunlight. Not all work needs a DA: minor work may be Exempt Development, and work meeting the fixed standards may qualify as Complying Development.
How does the NSW planning system fit together?
In order: the Environmental Planning and Assessment Act 1979; the Environmental Planning and Assessment Regulation 2000; Environmental Planning Instruments, which are State Environmental Planning Policies (SEPPs) and Local Environmental Plans (LEPs); and then Development Control Plans (DCPs).
What is a Complying Development Certificate?
Complying Development is a fast-tracked approval pathway in NSW for common residential and commercial development. The project must meet the standards in the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, and the certificate must be signed off by a certifier, a building professional usually working in private practice. A Complying Development Certificate can be issued within 10 business days, and the pathway can potentially save homeowners money.
Which developments may qualify as Complying Development?
Building a one-storey or two-storey home; renovating a home, including alterations and additions; demolishing a building; retaining walls and cut and fill; building a fence; and building a swimming pool. Each still has to meet the pre-set standards in the Codes SEPP.
What is the difference between a DA and a CDC?
A Complying Development Certificate is a complying-development pathway for work that meets the relevant fixed standards and is issued by a certifier. A Development Application is assessed by the local council against its planning controls on merit. The suitable pathway depends on the proposal and the site.
What is a BASIX certificate?
Building or renovating a home requires a BASIX certificate. BASIX stands for the Building Sustainability Index. It is part of the NSW planning system, covering both the DA and CDC processes, and aims to deliver water and energy savings across the state. The assessment can be done with the online assessment tool or by a qualified assessor, and it checks the proposed design against a set of sustainability targets.
What are the five steps to lodging a DA?
First, check the council planning rules for your land, which are on the council website and may need expert help to interpret. Second, prepare the plans and drawings. Third, prepare a Statement of Environmental Effects. Fourth, complete and sign the application forms and checklists. Fifth, lodge the application and supporting documents and pay the applicable fees. Requirements vary between councils.
Which plans does a residential DA most commonly need?
A site plan and site analysis; floor plans and elevations; a survey plan; a drainage plan; a construction management plan; a landscape plan; shadow diagrams; a notification plan; and a BASIX certificate. These are the most common plans rather than a mandatory list. Engineer design for structural elements and drainage, and any other relevant reports and forms, are also usually required.
What is a Statement of Environmental Effects?
A written report on the likely impacts of a proposal and how to reduce them. It covers the suitability of the site, the present and previous use of the land, and compliance with development standards such as floor space ratio, height and landscaping under the Local Environmental Plan and the relevant Development Control Plan.
Do I need council approval for my renovations?
It depends on the work and the property. The first step is to gather the property information: the NSW Planning Portal gives the zoning, floor space ratio, building heights and the applicable council and state legislation. Building designers, draftspersons and architects can help prepare the documents. After lodgement, council planners assess the plans, and if approved you obtain Development Consent. You also need a Construction Certificate before your builder can start construction.
Are council approvals guaranteed?
No. Plans and documentation can be prepared and coordinated, but approval decisions are made by councils or registered certifiers.
How is drafting priced, and are consultant costs included?
Every project is quoted individually according to its scope, approval pathway and site constraints, and a fixed-fee quote is provided before work begins. No prices are published. Consultant reports, including survey, structural engineering, arborist, bush fire, flood, heritage or geotechnical input, and council or certifier fees are separate when required.
Scope
What these answers are, and are not.
These answers describe how the NSW residential planning system works in general terms. They are not planning advice for a specific property. Planning controls differ between councils, between zones within one council, and change over time, and site constraints such as heritage listing, bush fire prone land, flooding, coastal mapping and foreshore building lines can change which pathway is available.
The controls that actually apply to a property are confirmed during the development controls review stage of a project, against the current Local Environmental Plan, Development Control Plan and relevant State Environmental Planning Policies. Approval decisions are made by councils and registered certifiers.
For the controls in a specific area, see the Sutherland Shire and Eastern Suburbs pages.
Questions about your own project? Request a quote.
Request a Fixed-Fee QuoteStart a project
Request a fixed-fee quote.
Tell us about your residential project and we’ll come back with a fixed-fee quote for the drafting stages you need.
Every project is quoted individually on its scope, approval pathway and site constraints. Consultant reports and council or certifier fees are separate and are listed in the quote where the project needs them.
Office
109 Bonds RdPunchbowl NSW 2196