Services

Granny flat and secondary dwelling plans

Custom designs and CDC plan approvals for secondary dwellings and studios, tested against the lot size and floor area limits that apply to the property.

Service

Eligibility first, then the design.

A secondary dwelling is governed by fixed standards, so the first question is whether the property qualifies. Under the State Environmental Planning Policy (Housing) 2021, a granny flat approved through Complying Development requires a lot of at least 450m² and a floor area of 60m² or less. Where the lot or the proposal falls outside those standards, the pathway becomes a Development Application assessed by the council.

Once eligibility is clear, the design works within what is left of the site: the landscaped area and setback controls, private open space for both dwellings, access, and privacy between the secondary dwelling and the existing house and its neighbours.

What this service covers

  • Custom granny flat and secondary dwelling designs
  • Studio designs and approvals
  • CDC eligibility assessment against the Codes SEPP and the Housing SEPP
  • CDC plans, or DA drawings where Complying Development is not available
  • BASIX certificate
  • Construction Certificate documentation

FAQs

Common questions.

What lot size do I need for a granny flat?

For a secondary dwelling approved through Complying Development under the State Environmental Planning Policy (Housing) 2021, the lot must be at least 450m² and the secondary dwelling must have a floor area of 60m² or less. Properties outside those standards may still be able to proceed through a Development Application.

How quickly can a granny flat be approved?

A Complying Development Certificate can be issued within 10 business days once the application and documentation are complete and the proposal meets the fixed standards. That timeframe covers the certificate, not the design and documentation stages before it, and a Development Application is assessed on merit by the council instead.

Can a granny flat use Complying Development on bush fire prone land?

Not in every case. In the Sutherland Shire, for example, land mapped at BAL-40 or Flame Zone (BAL-FZ) cannot use the Complying Development pathway. The bush fire attack level for the property is checked during the controls review.

Ready to start? Request a fixed-fee quote.

Request a Fixed-Fee Quote

Start a project

Request a fixed-fee quote.

Tell us about your residential project and we’ll come back with a fixed-fee quote for the drafting stages you need.

Every project is quoted individually on its scope, approval pathway and site constraints. Consultant reports and council or certifier fees are separate and are listed in the quote where the project needs them.

Office

109 Bonds Rd
Punchbowl NSW 2196

Fixed-fee quote before any work begins. No obligation.

Request a Fixed-Fee Quote