Services

DA plans and Development Application documentation

Development Application drawing sets, Statements of Environmental Effects, variations to development standards and the council compliance checks that support them.

Service

A complete application, resolved before lodgement.

A Development Application is an official request for permission to carry out development, which can mean construction or demolition of a building, the use of land, or the subdivision of land. The council assesses it against the Local Environmental Plan and the relevant Development Control Plan, along with all other applicable planning regulations, and each application is decided on its own merit, including whether the proposal suits the site and the neighbourhood.

Councils carry large application volumes, so issues are better resolved before lodgement than after. The documentation is prepared as one coordinated set, and information requests from the council are coordinated through to determination.

The five steps to lodging a DA

  1. Check the council planning rules that apply to the land.
  2. Prepare the plans and drawings.
  3. Prepare a Statement of Environmental Effects.
  4. Complete and sign the application forms and checklists.
  5. Lodge the application with its supporting documents and pay the applicable fees.

The plans a residential DA most commonly needs

  • Site plan and site analysis
  • Floor plans and elevations
  • Survey plan
  • Drainage plan
  • Construction management plan
  • Landscape plan
  • Shadow diagrams
  • Notification plan
  • BASIX certificate

Engineering design for structural elements and drainage, and any further reports or forms the council requires, are coordinated alongside the drawing set.

Statement of Environmental Effects

A Statement of Environmental Effects is a written report on the likely impacts of the proposal and how they will be reduced. It covers the suitability of the site, the present and previous use of the land, and compliance with the development standards that apply, such as floor space ratio, building height and landscaping under the Local Environmental Plan and the relevant Development Control Plan. Where a proposal departs from a development standard, a variation request is prepared to support it.

Related work

Projects of this type.

Dark brick duplex with a skillion roof and black-framed windows

Kirrawee, Sutherland Shire NSW · Completed 2020

Kirrawee Duplex

Dual occupancy development

Two-storey rendered home with a timber feature panel and balcony

Revesby NSW 2212 · Completed 2021

Two Storey Dwelling

New dwelling replacing an existing home

Project documentation and photography shown on this page were produced by House Plan Design & Drafting and are published here as reference work with attribution. Draftsman Sydney City is a separate business and does not claim these projects as its own completed work.

View all projects ↗

FAQs

Common questions.

Why is a DA required?

Development consent exists to ensure developments do not have a negative impact on the environment, to balance public and private interest in the desired and future character of an area, to provide a non-biased process that lets the community raise issues, to ensure local services and infrastructure are adequate, and to ensure structural safety with enough ventilation and sunlight.

Are council approvals guaranteed?

No. Plans and documentation can be prepared, lodged and coordinated, and information requests answered, but the approval decision is made by the council or a registered certifier, not by the designer.

How long does a council have to decide a DA?

Timeframes vary by application and council. In the Eastern Suburbs councils, a standard Development Application carries a 40-day deemed refusal period, extending to 60 days for integrated development. A deemed refusal period is not a decision deadline and the actual assessment time depends on the application.

Are consultant costs and council fees included in the quote?

No. Consultant reports, including survey, structural engineering, arborist, bush fire, flood, heritage or geotechnical input, and council or certifier fees are separate. They are listed in the quote where the project needs them.

Ready to start? Request a fixed-fee quote.

Request a Fixed-Fee Quote

Start a project

Request a fixed-fee quote.

Tell us about your residential project and we’ll come back with a fixed-fee quote for the drafting stages you need.

Every project is quoted individually on its scope, approval pathway and site constraints. Consultant reports and council or certifier fees are separate and are listed in the quote where the project needs them.

Office

109 Bonds Rd
Punchbowl NSW 2196

Fixed-fee quote before any work begins. No obligation.

Request a Fixed-Fee Quote